Caltrain CP Alameda And CP Shark Cutover South Bay SignalPublished by Tom Ryan in South Bay Signal News · 5 August 2021 Another successful cutover with Modern Railway Systems as part of the Caltrain Electrification Project. CP Shark and CP Alameda cutover, and PTC tested successfully and on schedule.